A two-wire proximity sensor can appear to remain active after the target has gone, especially on long cable runs or when the PLC input is unusually sensitive. The usual cause is not a failed sensor: it is the small off-state current that still flows through the two-wire circuit, combined with cable capacitance and the input threshold of the receiving device.

Engineering principle: treat the field circuit and the PLC input as two separate electrical interfaces. A correctly selected Delcon input relay gives the field signal defined switch-on and switch-off thresholds, then presents an isolated low-leakage DC output to the controller.

Why a two-wire sensor is never completely disconnected

A two-wire electronic sensor shares the same two conductors for its supply and output. Even when the sensor is off, it normally needs a small current to power its electronics. That off-state current flows through the receiving input. A long field cable adds capacitance, and nearby switching circuits can couple additional interference into the cable.

If the residual voltage at the PLC input is close to its switching threshold, the result may be an input that releases slowly, flickers, or stays logically high. The fault can be intermittent because cable length, routing, sensor type, input impedance and supply voltage all affect the result.

The five values that decide whether the input will be stable

  1. Actual field voltage: use the measured operating voltage, not only the nominal label.
  2. Sensor off-state leakage: obtain the maximum value from the sensor datasheet.
  3. Cable capacitance: calculate it from cable capacitance per metre and the installed length.
  4. Receiver thresholds: the switch-on and switch-off levels determine the noise margin.
  5. Required response time: AC input relays intentionally filter short disturbances and therefore switch more slowly than a 24 VDC input relay.

Why defined switch-on and switch-off thresholds matter

A single nominal input voltage does not tell you when a device will change state. A robust interface has hysteresis: its switch-on threshold is higher than its switch-off threshold. Once the relay has switched on, the input voltage must fall below a separate lower threshold before it switches off. That gap prevents a noisy signal from repeatedly changing state around one ambiguous point.

SLI24CR24 VDC field input16 V on / 14 V off0.3 ms typical switching
SLI120CRP120 VAC field input80 V on / 60 V off80 nF specified cable capacitance
SLI230CRP240 VAC field input160 V on / 140 V off80 nF specified cable capacitance

These are model-specific datasheet values. Verify the current Delcon datasheet and the sensor manufacturer’s limits before final design approval.

Select the relay from the field signal—not from the PLC voltage

The PLC side of these input relays is a separate DC load circuit. The choice between SLI24CR, SLI120CRP and SLI230CRP is made from the field-side signal that must be detected.

Field signal Suitable starting point Important check
24 VDC sensor or field contact SLI24CR Confirm the signal reaches 16 VDC to switch on and falls below 14 VDC to switch off.
120 VAC two-wire sensor SLI120CRP Check the 80/60 VAC thresholds, 3.5 mA switch-off current and 80 nF cable-capacitance limit.
230–240 VAC two-wire sensor SLI230CRP Check the 160/140 VAC thresholds, 3.5 mA switch-off current and 80 nF cable-capacitance limit.

What the PLC receives

All three examples provide a 0–60 VDC, 0–50 mA solid-state output with no minimum load requirement. The specified off-state leakage is 1 µA and the on-state voltage drop is 0.2 V. The field and controller sides are separated by Delcon’s pulse-transformer isolation; the datasheets specify a 4600 VAC RMS, one-second input/output test voltage.

This architecture is useful when the difficult part of the circuit is on the field side. The relay evaluates the real sensor voltage and gives the PLC a predictable isolated signal instead of asking the PLC card to tolerate every combination of sensor leakage, cable capacitance and field interference.

A practical diagnostic sequence

  1. Record the sensor part number, supply voltage, cable type and total cable length.
  2. Measure the voltage at the receiving input with the sensor both on and off. Use suitably rated instruments and safe working procedures.
  3. Compare the measured values with the receiver’s guaranteed switch-on and switch-off thresholds.
  4. Check the sensor’s maximum off-state leakage and the cable’s total capacitance.
  5. Temporarily separate the long field cable from parallel motor or contactor wiring if interference is suspected.
  6. Select an input relay whose published thresholds and cable-capacitance limit give a clear margin in both states.
  7. Test the complete circuit at minimum and maximum supply voltage and under real switching conditions.

When a cable or adapter solution is the better answer

For larger systems, individual point-to-point wiring may be a bigger reliability risk than the relay itself. Delcon’s PLC Fast Connect™ approach can connect relay boards to PLC or DCS I/O with pre-engineered cables and adapters. Existing solutions cover platforms including Siemens SIMATIC S7 and ET 200, Mitsubishi MELSEC Q and ABB S800. Delcon can also design a custom cable, adapter or complete connection solution for another PLC, DCS or remote-I/O system.

Design checklist

  • Match the relay to the actual field voltage and AC/DC signal type.
  • Use guaranteed switch-on and switch-off values, not a nominal-voltage assumption.
  • Include sensor leakage and total cable capacitance in the calculation.
  • Confirm response time is fast enough for the process.
  • Verify the PLC-side current and voltage against the relay output specification.
  • Follow the current datasheet, wiring and protection instructions.

Need help checking a sensor circuit?

Send Delcon the sensor datasheet, field voltage, cable type and length, and the PLC input data. We can help select the input relay and, if required, a ready-made or custom PLC connection.